| Extent of work: |
Elevator from Sanctuary to Fellowship Hall. More... |
| Projected cost: |
$154,720 |
| Final cost: |
|
| Start date: |
Not yet scheduled |
| Percent completed: |
|
| Problems encountered: |
|
| Blessings realized: |
|
|
|
Proposed plans
- Elevator
- Demolition of three floors and reframe for elevator
- Electrical upgrade to service new elevator
- Sanctuary level
- Rework floors and ceiling
- Realign interior doors
- Elevator enclosure
- First level
- Framing, walls, floor, ceiling to provide access between Christian Ed room and office area
- New doors, frames, hardware
- Flooring carpet
- Paint walls
- Ground level
- Elevator machine room enclosure
- Door, frame hardware
- New room door
- New walls, celiling, and flooring for new room
- Demolition of stage/stairs; finish floor, repair walls
- Repair all rotted wood framing at floor line
|
|